Показать сокращенную информацию

Segey, Shtun
Alexander, Senkov
Oleg, Abramenko
Marat, Nukhaev
Ilkam, Mukhametshin
Konstantin, Naydenskiy
Artem, Galimzyanov
Ekaterina, Popova
2021-08-13T09:30:10Z
2021-08-13T09:30:10Z
2019-10
Segey, Shtun. The Results of the Pilot Works on Well Completion Technologies and Continuous Monitoring on the Example of Extremely Long Horizontal Wells of the Yu. Korchagin field in the Caspian Sea [Текст] / Shtun Segey, Senkov Alexander, Abramenko Oleg, Nukhaev Marat, Mukhametshin Ilkam, Naydenskiy Konstantin, Galimzyanov Artem, Popova Ekaterina // SPE Annual Caspian Technical Conference 16 - 18 Oct, Baku, Azerbaijan: Society of Petroleum Engineers. — 2019. — № 2019.
https://www.onepetro.org/conference-paper/SPE-198390-MS?sort=&start=0&q=198390&from_year=&peer_reviewed=&published_between=&fromSearchResults=true&to_year=&rows=25#
https://elib.sfu-kras.ru/handle/2311/142388
This paper presents the experience of LUKOIL-Nizhnevolzhskneft of implementation of various completion designs and continuous monitoring systems for extended-reach horizontal wells. The article describes the evolution from stand alone sand control screens and passive inflow control devices to the introduction of multi-zone advanced smart wells with inductive coupling. In addition, the work presents experience with fiber-optic distributed temperature measuring systems and chemical tracers. Since 2010, There are a lot of advanced technologies for well completion and continuous monitoring has been introduced at the field named after Yu. Korchagin, including nozzle-based inflow control device (ICD), autonomous ICD, ICD with check valve, sliding couplings, multiposition couplings, interconnected sand screens, fiber optic systems, chemical tracers, hydraulic and electric smart wells. The application of some technologies turned out to be limited in the conditions of the field named after Yu. Korchagin, part of the technologies had limited implementation due to the long length of horizontal wells, and some technologies showed unique benefits and were recommended for further wide implementation. Pilot projects of some technologies, as well as the use of various completion systems and continuous monitoring systems at the wells of the Yu. Korchagin field, allowed LUKOIL-Nizhnevolzhskneft not only to solve current operation problems, but also to select optimum technologies for usage in the following fields of Caspian shelf.
Horizontal well
well completion
The Results of the Pilot Works on Well Completion Technologies and Continuous Monitoring on the Example of Extremely Long Horizontal Wells of the Yu. Korchagin field in the Caspian Sea
Journal Article
Journal Article Preprint
2021-08-13T09:30:10Z
10.2118/198390-MS
Институт нефти и газа
Кафедра разработки и эксплуатации нефтяных и газовых месторождений
SPE Annual Caspian Technical Conference 16 - 18 Oct, Baku, Azerbaijan
без квартиля


Файлы в этом документе

Thumbnail

Данный элемент включен в следующие коллекции

Показать сокращенную информацию