Nadezhda V. Kononova. About the task of leveling the "false" operations of the heat load regulator [Текст] / Nadezhda V. Kononova, Denis A. Zhalnin, Olesya V. Chubarova // Applied Methods of Statistical Analysis Statistical Computation and Simulation. — 2019. — С. 566-573
http://amsa.conf.nstu.ru/amsa2019/proceedings/
https://elib.sfu-kras.ru/handle/2311/128727
The efect of a heat load regulator "false" operation is inherent in systems with cross connections (boilers - main steam main - turbine, fastresponse PRDS - fast-response pressure-reducing and desuperheating station). The boiler heat load regulator (HLR) is triggered "falsely" to a signifcant external disturbance from the steam line. The work is devoted to the problem of a boilers HLR response correction solving for the regulator "false" operation leveling for a thermal power plant (TPP) with cross links (or the combined heat and power plant (CHP)). The solution is based on the analysis of the data from measurement sensors in real time. Подана заявка по индексации сборника в Scoupus, аналогичные сборники прошлых лет входили в базу.
coal thermal power station
combined heat and power plant
steam line
heat load regulator
"false" operations
algorithm of leveling
correction circuit
About the task of leveling the "false" operations of the heat load regulator
Journal Article
Journal Article Preprint
566-573
28.17.19
2020-01-20T07:15:02Z
Институт космических и информационных технологий
Кафедра информационных систем
Applied Methods of Statistical Analysis Statistical Computation and Simulation
без квартиля


Файлы в этом документе

Thumbnail

Данный элемент включен в следующие коллекции

Показать сокращенную информацию